Project_Grubb Road Bridge1

The Central Avenue Bridge, ALL-ML504-0.30, is located between Eureka Street and Elm Street in the City of Lima. Superstructure replacement and repair of existing abutments and pier was performed by R.G. Zachrich Construction Inc. The old structure was built in 1971. Total cost was $785,103.01, which was paid with 95% Federal Funds and 5% Local Funds.

            



COPYRIGHT © 2024 Allen County Engineer

Site Designed and Developed by CorpComm Group, Inc.


Allen County Engineers